Lords Cricket Ground – Marylebone
Three sets of movable wall systems were installed in the new steel structure Hospitality Building which replaced the old tent marquees in 1999. Floor space needed to be used effectively so that functions of varying size could be held.
The Hospitality Building was erected on the nursery slope outside the main ground, falling 1 metre over 70 metres. The tracking system was successfully installed on this slope completing the project on time, within budget and to the complete satisfaction of the Marylebone Cricket Clubs.
Specification
• Duvale Type 110c
• Series 4500
• White Laminate Finish
• Two Carrier Suspension
Testimonial:
We have a very large Hospitality Suite here at Lords and it is vital that we have the option to allow more than one party to use this at a time. The Duvale sliding partitions allows us to do this easily and surprisingly quickly given the size of the openings spanned.