Case Study 5

Case Study 5

Blossom House School – Wimbledon

 

Blossom House School wanted to divide their gymnasium, With class sizes growing it was important that the school maximise the use of the space they had. The school can now run two lessons at the same time in an area they would have previously only been able to have one.
The partition needed to be more than 4 metres high to allow use of the gymnasium to a good height when the panels were stacked away. It was necessary to have access through the partition when the panels were fixed in place. As you can see, two inset pass doors have been incorporated into two of the panels.

Specification

• Top hung Duvale type 110c
• MFC finish from our standard range
• Single Point Suspension for centre stacks at each end
• 2 x inset pass door panels incorporated into the set for access from one side to the other

Testimonial:

We could not be happier with the product and servce that we received from Duvale PLC. From start to finish the project ran smoothly and to budget. The folding partition has given us the flexibility to run two classes at a time in the gymnasium. We can still use the hall when the partitions are open. It is a true asset to our school and I would not hesitate to recommend one to another school.

Connect with usFollow us on Twitterfederation of small businessesDesigned and hosted by: Somerset Media Design